1 Basic project for the waste heat of the flue gases in TO East boiler VKSM60
connected in cascade to heat the administrative building of Makpetrol AD ​​- Skopje.
Project 2014
2 Making the professional supervision of installation of waste heat in the flue gases in TO East boiler VKSM60 Surveillance 2014
3 Project from all phases for introduction of natural gas and adaptation of premises choise of equipment for boiler room with gas condensing boilers with capacity  3 × 300 kW Project 2014
4 Making Basic project to build a new BPS in Vevcani on MAKPETROL – Skopje, complete with liquid fuels and LPG and building a station for loading compressed gas in motor vehicles -Station daughter V = 300 Nm3 / h Project 2014
5 Making Basic Design for Reconstruction of BPS “Guerrilla – Skopje, Makpetrol – Skopje and build a station for loading compressed natural gas in motor vehicles – mother Station V = 1000 Nm3 / h Project 2014
6 Project to build a new GS in Kjojlija – Skopje, MAKEPTROL – Skopje, complete with liquid fuels and construction of the loading station for compressed gas in motor vehicles – mother Station V = 4000 Nm3 / h Project 2014/2015
7 Construction of GS “LORI CAR – Highway Veles – Skopje in Idrizovo (rebranded to LUKOIL) Supervision 2014/2015
8 Preparation of a project for upgrading LPG GS – “PAMELA” – Negotino Project 2015
9 Project built drawings for internal stations for storage and distribution of oxygen, carbon dioxide and acetylene in “TO STYLE” Ltd. – Staro Nagoricane, Kumanovo Project 2015
10 Storage and loading station for LF and LPG in KJOJLIJA – Skopje for “Logistics OIL” – Skopje, with a total volume of 10,000 m3 + 400 m3 Preliminary design 2015
11 Project from all phases of introducing natural gas and adaptation of premises choice of equipment for boiler room for gas boiler at the High School “Cvetan Dimov” – Skopje Project 2015
12 Project from all phases za regards natural gas introduction and adaptation of premises choice  of equipment for boiler roo, for gas boiler at the High School “Pance Arsovski” – Skopje Project 2015-
13 Pump station to raise water pressure to suppress secondary cooling furnaces 1 and 2 in the hot rolling mill plant within the project MAKSTIL AD Project 2015
14 Project from all phases for introducing natural gas and adjusting premises choice of equipment for gas boiler room at the Health Centre “BUCHAREST” – Skopje Project 2014
15 Basic project new CPS “Pucko PETROL” to Avtokomanda Continental in Skopje, owned by “Pucko PETROL” – plasnica. Project 2015-
16 Built Project for internal station for storage and distribution of helium, argon, nitrogen and gas mixer with “ARC” TIDZ 2 Skopje Project 2015
17 Built Project for the installation of technical and medical gases at Center for Positron Emission Tomography “PET CENTER” – Skopje Project 2015
18 Projects from all stages of secondary gas pipeline network in Strumica (length of over 20 km) Project 2015/2016
19 Project from all phases for regards natural gas introduction and adaptation of premises choice of equipment for gas boiler room and technological consumers’ Agrokomerc 92 “- Strumica. Project 2016
20 Main projects of all stages PS “Trubarevo” with standards of LUKOIL, the “Kerosin 13″ – Skopje Project 2016
21 Request prior approval for station liquid oxygen within the PHI “University Clinic for Infectious Diseases and febrile conditions” – Skopje Project 2016
22 Built Project for station supply oxygen, nitrogen oxide and carbon dioxide within the PHI Special Hospital for Surgical Diseases “Filip II” – Skopje Project 2016
23 Preparation of Preliminary and Main Designs of all phases to upgrade the storage and translate the existing COG BPS in Gostivar MAKEPTROL AD Skopje Project Underway
24 Preparation of Preliminary and Main Designs of all phases to upgrade the storage and translate the existing COG BPS in Bitola Makpetrol AD ​​Skopje Project Underway